Water of Leith Improvements, Dunedin
Working with Mike Moore and Otago Regional Council, a 3D model was produced to develop visualisations of proposed changes to the Water of Leith river. The works included creating greater public access to the river with walkways along both sides, art spaces and seating, river naturalisation works and the removal of concrete channel walls, and space for sculptures to be generated by a local artist at a later date.
Client
Otago Regional Council
Year
2018